Apave Solution
Apave had two tasks. First, it had to validate the machine’s design (that is, its suitability for the structure to be built), its operating principles, the manufacturer’s design calculations and drawings and the entire instrumentation and control system. Second, it had to verify the plans’ compliance with European safety regulations (EC marking) and once again, when the machine was assembled and installed on site.
